Norcrete is a two-component 100% solids epoxy crack filler designed for shallow repair on either vertical or horizontal surfaces. This product is easy to mix and use and has a non-critical mix ratio. Additionally, the product, because it is a 100% solids formulation, can be applied thicker on horizontal surfaces when required. Norcrete is recommended for repairing cracks, pits, divots, and defects in concrete or masonry. Used by flooring professionals for it’s durability and instant recoatability.
SIZE: 2 qrt kit (1 qrt part a / 1 qrt part b)
SOLIDS BY WEIGHT: 100%
SOLIDS BY VOLUME: 100%
VOLATILE ORGANIC CONTENT:Zero pounds per gallon
COLOR: Gray (when mixed)
RECOMMENDED FILM THICKNESS:1/8” cracks or thin build repairs.
COVERAGE PER GALLON: 0.13 cubic feet or 1,228 lineal feet @ 1/8” x 1/8”
PACKAGING INFORMATION: 2 quart kits (volumes and weights approximate)
MIX RATIO: 1 part A to 1 part B by volume
ABRASION RESISTANCE: Taber abraser CS-17 calibrase wheel with 1000 gram total load and 500 cycles = 36 mg loss
FLEXURAL STRENGTH: 7,500 psi @ ASTM D790
COMPRESSIVE STRENGTH: 8,710 psi @ ASTM D695
ADHESION: 350 psi @ elcometer (concrete failure, no delamination)
VISCOSITY: Mixed = > 3,100,000 cps (typical)
DOT CLASSIFICATIONS: Part A “not regulated” Part B “CORROSIVE LIQUID N.O.S., 8, UNI1760, PGIII” (small quantities (qrt) aren't regulated)
TENSILE STRENGTH: 6,256 psi @ ASTM D638
ULTIMATE ELONGATION: 2.4%
GARDNER VARIABLE IMPACTOR: 50 inch pounds direct – passed
HARDNESS: Shore D = 65
HEAT DEFLECTION TEMP.: 59 degrees C (138 degrees F)
CURE SCHEDULE: (70°)
pot life – 2 gallon volume ………………...……………... 1-3 hours
tack free (dry to touch)………….....……………………. 5-10 hours
recoat or topcoat……………………. immediately after application
light foot traffic...…………………………………...……10-24 hours
full cure (heavy traffic)... ……………….....................…....2-7 days
APPLICATION TEMPERATURE: 60-90 degrees F.
PRODUCT STORAGE: Store product at normal room temperature before using. Continuous storage should be between 60 and 90 degree F. Low temperatures or temperature fluctuations may cause product crystallization.
SURFACE PREPARATION: All dirt, foreign contaminants, oil and laitance must be removed to assure a trouble free bond to the substrate. A test should be made to determine that the concrete is dry; this can be done by placing a 4’X4’ plastic sheet and taping down the edges. If after 24 hours, the substrate is still dry below the plastic sheet then the substrate is dry enough to start repair work. This product is intended for hairline cracks and other fractures up to an 1/8 inch in width. Remove all unsound concrete from within the crack to be repaired and thoroughly vacuum all debris and dust from within the crack opening.
PRODUCT MIXING: This product has a mix ratio of 1 part A to 1 part B by volume. To mix, simply measure out equal volumes of the material and mix them together thoroughly with slow speed mixing equipment such as a jiffy mixer, putty knife or spatula until the material is thoroughly mixed and uniform in color. Mix only an amount of material that can be used in the allotted pot life period. Improper or insufficient mixing may result in product failure.
PRODUCT APPLICATION: The mixed material can be applied by marginal trowel, putty knife or any other suitable equipment.
RECOAT OR TOPCOATING: When repairing cracks that are less than 1/8” thickness, many epoxies can be placed directly over the applied crack filler before it is cured. Alternatively, it is also acceptable to allow the material to cure before installing the coating. If excessive amounts are spread well beyond the crack repair or in an areas where surface repairs have been implemented, it is best to check the cured areas for any possible amine blush (a whitish, greasy film or deglossing) prior to coating over this material. If a blush is present, it can be removed by any standard type detergent cleaner prior to topcoating or recoating. Many epoxy coatings and urethanes are compatible for use over this product as well as multiple coats of this product.
CLEANUP: Use Xylol (Xylene).
Norcrete Product Data Sheet
WE CANNOT EXPEDITE THIS ITEM: Some components in this flooring system may not be eligible for expedited shipping (Next Day Air, 2nd Day Air, or 3-day Select) because they are considered hazardous materials and may not be allowed on airplanes. For rush shipment inquiries please contact us at 586-771-6500 to discuss the fastest shipping options to your location.